Custom Precast Formwork with Shuttering System Magnet Exporters, Products

The Precast Formwork with Shuttering System Magnet is made up of formwork steel bars and an embedded magnetic suction cups system, the width of the steel formwork is 60mm, the height is 60MM, 65MM, 70MM, 85MM, 100MM, etc., and the length is 1m, 1.5m, 2m, 3m, 3.5m, 4m, etc., and special heights can be customized according to the actual requirements to be suitable for the production of different concrete components. different concrete components production.

Product Description

The precast concrete Shuttering system magnet is composed of formwork steel bars and an embedded magnetic suction cups system. Designed for versatility, the width of the steel formwork is 60mm, with available heights ranging from 60MM to 100MM. Standard lengths include 1m, 1.5m, 2m, 3m, 3.5m, and 4m. Special heights and dimensions can be customized to suit the production requirements of various concrete components.

Formwork magnet height variations
Formwork magnet height options
Formwork magnet length variations
Formwork magnet length options

Working Principle & Operation

By utilizing high-power suction cups, the magnetic formwork systems maintain close contact with the platform, ensuring the molded component formwork system is held firmly in place. Because the mold and suction cups function as a single unit, there is no positional movement, preventing the Shuttering system from deforming. The operation is simple and quick, enhancing workspace safety and stability. The suction cups can be pried up easily using a matching pry bar to remove the mold from the platform.

Protection & Customization

The suction cup system is strategically located inside the steel formwork channel, shielding it from concrete residue or dirt that could damage the mechanism. Additionally, the system features a chamfering function with three customizable options to meet specific project aesthetics and structural requirements.
Chamfering function options
Formwork magnet with 3 chamfering options

Industrial Advantages

With the global growth of the precast building industry, magnetic fixing products have become essential. By embedding the magnetic block directly into the formwork, this system offers superior convenience, efficiency, and stability compared to traditional magnetic box fixing methods.
Advanced manufacturing technologies, including fiber laser cutting machines, electro-hydraulic servo CNC bending machines, and CNC lathes, are employed to produce magnetic edge molds of various sizes. Edge molds up to 4 meters can be shaped in a single operation, ensuring high precision and structural integrity.
Advanced production equipment
Precision manufacturing equipment

Comprehensive Magnetic Solutions

Our expertise lies in providing innovative solutions for magnetic applications in the construction sector. The product range includes Fishing magnets, Hook magnets, Shuttering systems and connecting accessories, Formwork magnets, Magnetic chamfering strips, and various prefabricated magnetic holders.
Production facility
Specialized manufacturing facility

Packaging & Transportation

Products are securely packed to withstand international transit, ensuring they arrive in perfect condition for immediate use on the production line.
Wooden case package
Durable wooden case packaging
Inner package detail
Secure inner packaging for magnets

Frequently Asked Questions

What are the standard sizes for the shuttering system magnet?
The standard width is 60mm. Heights vary from 60mm to 100mm, and standard lengths range from 1m to 4m. Custom sizes are also available upon request.
How does the magnetic formwork system stay in place?
It uses a high-strength magnetic suction cup system embedded within the steel frame, which creates a powerful bond with the steel platform to prevent movement or deformation during concrete pouring.
Is the magnetic system protected from concrete buildup?
Yes, the magnetic suction cup system is housed inside the steel formwork channel, which protects it from concrete residue, dust, and other contaminants.
How is the formwork removed after the concrete sets?
The system is designed for easy removal using a specialized matching pry bar, which releases the magnetic suction and allows the mold to be lifted without damaging the platform.
Can I get a custom chamfer for my concrete components?
Yes, the formwork magnets come with a chamfering function, and we offer 3 customizable options to meet your specific design requirements.
What makes this system better than traditional magnetic boxes?
Because the magnets are directly integrated into the edge mold, the system is more stable, efficient to set up, and requires fewer separate parts than using independent magnetic boxes.

Related Products